July 21, 2020
Annual emergency light testing: English Building and Leasure Hall
Annual emergency light testing for the English Building and Leasure Hall will take place from 4-7 a.m. on Wednesday, July 22.
This test will consist of turning off circuit breakers for circuits identified as providing power to emergency lighting fixtures. The entire building will not lose power, only specific circuits will be affected. Any electrical devices on these circuits will lose power during the test. Normal power should be restored no later than 7 a.m.
For questions, please contact 785-313-6108 or camel@k-state.edu.