April 12, 2021
All Faiths Chapel and Dickens Hall annual emergency light testing
Annual emergency light testing will take place from 4-7 a.m. Tuesday, April 13, at All Faiths Chapel and Dickens Hall.
This test will consist of turning off breakers for circuits that provide power to emergency lighting fixtures. The entire building will not lose power, only specific circuits will be affected. Any electrical devices on these circuits will lose power during the test. The test is scheduled to run from 4-7 a.m. to minimize disruption for building users. Normal power should be restored no later than 7 a.m.
Contact 785-313-6108 or camel@k-state.edu with any questions.